CP Windsor / Galt Part 1CP Windsor / Galt Part 1
$4,99
  

Instant Download
File Size 522.92 kB

CP Windsor / Galt Part 1

This layout features the CP Windsor subdivision and part 1 of the Galt subdivision. Most portions of the Windsor subdivision is ABS/OCS, with limitations of TD3, I have modeled everything as CTC. 

Running from the Detroit Tunnel in Windsor On, the layout continues on to Streetsville in the East and Campbellsville in the South. Morning and afternoon GO train rushes, with storage at Milton.

GO Trains from Milton to Streetsville ( Not all shown )
GO 2704 K2 - M2 Milton GO 05 59 Lisgar GO 06 08 Meadowvale GO 06 12 Streetsville GO 06 19

CP Mainline trains ( Not all shown )
CP 147-1 Toronto - Detroit M2 - A1 1350 2000’  Daily, work Wolverton, W.Coak, London, Windsor, crew time 200
Cp 235-1 Toronto - Gibson IHB M2 - A1 0720 5900’ Daily work Wolverton, w.coak, Windsor, crew time 120
CP 650-1 Chicago - Montreal A1 - M2 2210 7200’ MWF No work, crew time 120

Yard assignments at Windsor, London, and Wolverton ( Not all shown )
CP TL11-0645 - HCL 45 Minutes E2 - E2 0705 1200’ crew 120
CP TL40-0755 - ETR Yard B3 - C2 - B3 0755 1200’ crew 120
CP TK39-2150 - Ayr backtrack H3 - H3 2150 1200’ Crew 340

Local shortlines included ( Not all shown )
OSR 6508 Woodstock Job F1 - F1 1400 5300’ Daily, work W.Coak
ETR 108-1 ETR Local C5 - C5 0920 3600’ Daily, work ETR yard

Ready to run start times include:
0500 Monday, no end time
1300 Tuesday, no end time
2200 Friday, no end time

You must own the base game in order to play these layouts. Please follow these links if you have not already purchased TD3.5. ( I have nothing to do with the actual program, just the layouts )

You can purchase the TD3 program here:
tomlevine.wixsite.com/train-dispatcher
ebay.com/itm/174604857247?hash=item28a742af9f:g:uVwAAOSwT6pVuhVy